Swift Creek Upper Power Plant Restoration
Bridger Teton National Forest

CLIENT: Lower Valley Energy/Town Afton

CONSTRUCTION COST: $4,000,000

COMPLETED: April 2009

HIGHLIGHTS:

  • Vertical Francis Hydro Unit
  • 900 kW Generator
  • 7,000 Lineal Feet of 42-inch Penstrock
  • Minimal Facility Foot Print
  • Restored Existing Historical Building
 

SUNRISE PARTICIPATION:

  • Design and construction observation