Ogden City Culinary Water Treatment Plant
Ogden

CLIENT: Ogden City

CONSTRUCTION COST: $11,000,000

HIGHLIGHTS:

  • Demolish Existing Filter Building
  • Construct Membrane Filtration Building
  • Replace Black Point Weir
  • Construct Mechanical Dewatering Facility
  • Water Reuse of 99.9%
  • Ability to Expand Production
  • Conference Room

SUNRISE PARTICIPATION:

  • Study
  • Equipment selection
  • Design
  • Bidding
  • Land Surveying
  • Geotechnical Analysis
  • Construction administration

READ MORE




This is an example of a HTML caption with a link.