Juniper Ridge Hydroelectric Project
Bend, Oregon

CLIENT: Central Oregon Irrigation District

CONSTRUCTION COST: $26,000,000

COMPLETED: November 19, 2012

HIGHLIGHTS:

  • Design-Build 13,200 Lineal Feet of 108” Diameter Steel Pipe
  • Innovative design saved the owner $1,000,000 in equipment and facilities
  • 5.0 MW Turbine/Generator
  • Design-Build Procurement 

SUNRISE PARTICIPATION:

  • Powerhouse Design
  • Construction administration service

READ MORE