Newton Pressurized Irrigation
Newton, Utah

CLIENT: Newton Water Users Association

CONSTRUCTION COST: $1,400,000

COMPLETED: May 2016

HIGHLIGHTS:

  • 34,000 LInear Feet of 48 inch to 6 inch HDPE pipe
  • Two WaterSMART Grants from BOR
  • Loan from DWR
  • Water allocation increase of 25-28%
  • Pipeline crosses eight roads
  • 30 inch bore under State Hwy 142
  • Stream crossing

SUNRISE PARTICIPATION:

  • Preliminary Engineering
  • Grant Application
  • Water Model
  • Design
  • Environmental Investigation 
  • Easement Preparation 
  • Construction Administration

READ MORE




This is an example of a HTML caption with a link.